View Details

Return to the Bids Homepage

Bid Classification: 
Construction
Bid Type:  RFQ
Bid Number:  UTL24-031
Bid Name:  East and West Water Treatment Plant Upgrades and Treatment Options Evaluation, Planning and Design for Emerging Contaminants Removal - Engineering Services
Bid Status:  Awarded
Bid Awarded Date:  Tue Jan 21, 2025 (EST)
Bid Closing Date:  Fri Aug 2, 2024 2:30:00 PM (EDT)
Question Deadline:  Tue Jul 23, 2024 2:30:00 PM (EDT)
Electronic Auctions:  Not Applicable
Language for Bid Submissions:  English unless specified in the bid document
Submission Type:  Online Submissions Only
Submission Address:  Online Submissions Only
Public Opening:  No
Description: 

REQUEST FOR QUALIFICATIONS 

FOR

EAST AND WEST WATER PLANT UPGRADES AND TREATMENT OPTIONS EVALUATION, PLANNING, 

AND DESIGN FOR EMERGING CONTAMINANTS - ENGINEERING SERVICES (GRANT/LOAN FUNDED)

RFQ NO. UTL24-031

The City of Boynton Beach is seeking the services of a qualified Engineering Consulting firm (Consultant/Vendor) to assist with East and West Water Treatment Plant upgrades and treatment options evaluation, facilities plan for the State Revolving Fund (SRF) Drinking Water Program, including design, bid document preparation, permitting, bidding assistance, and construction management engineering services during construction projects at both plants. Work will include: Conducting a study, preparation of a report, and performing engineering services to evaluate the ability of the existing treatment processes at the 24 million gallon per day (MGD) capacity conventional East Water Treatment Plant (located at 124 E. Woolbright Road) that utilizes lime softening, multi-media gravity filtration, and Magnetic Ion Exchange (MIEX) processes to meet the proposed Emerging Contaminants PFAS regulations, evaluate alternatives as described in the Florida Department of Environmental Protection (FDEP) Request for Inclusion (RFI) document. 

This study and facilities plan will also evaluate options for the treatment at the West Water Treatment Plant (located at 5469 W. Boynton Beach Blvd.) that utilizes sand or granular filtration for pretreatment followed by nanofiltration (NF) membranes and any upgrades needed to the treatment process, electrical system, including power (13 kV to 480V), Motor Control Center (MCC) equipment, Supervisory Control and Data Acquisition (SCADA), instrumentation, and control components for automation of the treatment process to meet regulations for emerging contaminants or other identified future regulations for potable water.

The study and facilities plan should include short-term and long-term recommendations at both the East and the West Treatment Plants to meet treatment requirements for emerging contaminants and other known future regulations for potable water. The plan needs to address source water options and permitting assistance as needed. Currently, the City has 30 groundwater wells and 2 aquifer storage and recovery (ASR) wells (that could potentially be converted to production wells) as well as design and permitting of additional potential future groundwater wells or alternative sources of water to address emerging contaminants as well as potential treatment for emerging contaminants at  individual source water wells.

Phasing of the treatment plant upgrades during construction shall minimize disruption of operations and plant shutdowns.

Upon completion of the study and facilties plan, the Consultant will design and permit improvements identified in the alternative analysis study and provide construction bidding and construction management services. Services and specific schedules will be further defined in detail in Task Orders issued for each phase of work. Work will be categorized into the following phases:

  1. Pre-Design Analysis (or Planning/Study/Report) Phase (expected time to complete within 9-12 months)
  2. Preliminary Design Phase and Estimated Construction Costs
  3. Final Design and Construction Documents Phase and Estimated Construction Costs
  4. Permitting Phase (expected time to complete phases 2, 3, and 4 within 9- months)
  5. Bidding and Negotiation Phase (expected time to complete in 3-4 months)
  6. Construction Administration Phase (schedule to be Determined)

The Consultant shall assist the City to identify and obtain funding opportunities such as grants, SRF loans, as needed for design and construction phases.

ELIGIBILITY:

  1. Proposers will be eligible to respond to this Request for Qualifications if the proposing Firm demonstrates that they or the principals assigned to this project have successfully completed services similar to those specified in the Scope of Services of this RFQ.
  2. Proposers must include as a part of the RFQ submittal, sufficient documentation, client references, and qualifications to support their ability and experience to perform the services contained in the RFQ.
  3. Proposers shall be registered firms licensed with the State of Florida. All professional services shall be performed under the direction of a professional registered with the State of Florida and qualified in the specific field.
Bid Document Access:  Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation.
Categories:  Show Categories [+]
  • Consulting Services - Professional Services
    • Administrative
    • Recreation
    • Management
    • Geotechnical
    • Training
    • Disaster & Emergency Management
    • Economic Development
    • Other
    • Architectural
    • Document Accessibility
    • Insurance
    • Public Relations
    • Translation
    • Planning
    • Engineering
    • Travel
    • Environmental
    • Surveying (OLS/Legal)
  • Water and Sewer
    • Flow Testing
    • Hydrant Painting
    • Wastewater Treatment & Services
    • Water Treatment Chemicals Supplies & Services
    • Well & Water Related Services
    • Watermain Swabbing
    • Cathodic Protection
    • Hydrant Inspections
    • Emergency Watermain
    • CCTV Inspection
    • New or Replacement Water/Sewer Lines
    • Water Meters
    • Catch Basin Cleaning
  • Construction
    • Infrastructure (Traffic Signalization)
    • Affordable Housing
    • Parks, Trails & Landscape
    • Roads, Bridge, Sidewalks
    • Drainage
    • Supplies (barricades, pylons, speed signs, etc.)
    • Infrastructure
    • Building & Renovation
    • Municipal Drains
    • Infrastructure (Wastewater)
    • Restoration Services
    • Remediation Services
    • Demolition
    • Heavy Duty Equipment
  • Professional, Strategic, Administrative or Management Services
  • Heavy Construction - Earth Handling Equipment (Industrial)
    • Services
    • Supplies and Equipment
  • Contracted Services

Meeting Locations

The following are the meeting times and locations for the bid:


This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.

Awarded

The following are the awarded vendor(s) for the bid:

No Awarded Vendors


Bids Submitted

The following are the unofficial bid results

No submitted bids

Plan Takers

The following are the registered plan takers for the bid:

There are no registered plan takers for this bid.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.